Get in touch with the Greenlight team.
If you run a qualification lab, an R&D group, or a manufacturing line, and the Greenlight message resonates with you, we’d love to get in touch.
Click, use the arrow keys, or use the controls below to see who’s here.
Leadership
Dr. Robert Bryant
30+ years as a NASA Langley senior scientist and branch head. Sole inventor on the two NASA TapeLayer™ patents. National Inventors Hall of Fame, Space Foundation Hall of Fame, NASA Inventors Hall of Fame.
David B. Smith
Finance, Operations, and Investor Relations.
Richard R. Newton
Corporate and legal. Structure, agreements, and the paperwork behind the instruments below.
Current Build Partner — Andrews-Cooper
TapeLayer™ prototype engineering and build currently run with Andrews-Cooper, an established product-development engineering firm and Greenlight’s current Build Partner — the hardware program is staffed beyond the founding team from day one.
Who We Work With
Aerospace primes & non-prime suppliers
Qualification cost and cycle time — 12–24 months and $0.5M–$5.7M per material or process — gate which parts a supplier can even bid on, and overbuild taxes every one they win.
Research institutions
Universities, research institutes, and government labs. Published allowables ignore Step 1 — who laid the material up, how, and in what environment — so their own data never ties back to the machine and conditions that made the part.
Orthopedic & sporting-goods manufacturers
Full aerospace-grade qualification is rarely the requirement, but the same slow data pipeline still gates allowables development and prototype iteration — on a product cycle measured in months, not years.
Energy
Wind and similar composite-structure builders, at fleet scale. Every kilogram that can’t be proven necessary is molded into every unit shipped — overbuild compounds into cost, not just weight.
Two ways to learn more
There’s much more we’ve been working on behind the scenes, and we’d love to share it with you. Please consider signing either of the documents below so that we can share more of our vision. Neither document is a purchase obligation, an NDA, or a contract.
| Letter of Interest | Letter of Intent | |
|---|---|---|
| What it is | One page, signed in a personal capacity (not institutional), describing a general use case. | A distinct, stronger instrument: signing places you on the priority wait-list for early product access. |
| What you get | A recorded, countersigned statement of interest — and portal access following review. | Priority wait-list position plus direct input on product design as the TapeLayer™ and the Greenlight Loop™ platform mature. |
| What it commits you to | Nothing. No expiration or rescission clauses — it is not an NDA and not a contract. | No purchase obligation. It records intent about potential future leasing or purchasing, nothing more. |
| Get it | Read the Letter of Interest → | Read the Letter of Intent → |
Want hands-on time first? Run the public demo →
Reach Us
General, customers & partners
Tell us what you build, what you qualify, and where the weeks go today.
Just reading for now? See the five-minute pitch →
Investors
Materials are provided under access — see the investor page for how to request them.